Skip to main content

Interview session 4, 1999 September 24

 Item — Multiple Containers

Scope and Contents

The audio for most of Tape 9 is missing, but is reflected in the interview transcript. In the fourth and final interview session, conducted on September 24, 1999, Duncan continues to discuss serving on the Northwest Power Planning Council from 1990 to 1995. He revisits the topic of the shutdown of the Trojan nuclear power plant, and talks about his working relationship with the NWPPC council members and staff. He discusses the controversies surrounding the 1995 departure of Ed Sheets from the council; talks about working with federal agencies, particularly the U.S. Army Corps of Engineers; and shares his thoughts about the future of power generation on the Columbia River. He closes the interview by reflecting on his career in the public and private sectors.

Dates

  • Other: 1999 September 24

Creator

Conditions Governing Access

Collection is open for research.

Extent

From the Collection: 0.1 Cubic Feet (9 audiocassettes (6 hr., 52 min., 37 sec.) + transcript (182 pages))

Language of Materials

From the Collection: English

Repository Details

Part of the Oregon Historical Society Research Library Repository

Contact:
1200 SW Park Ave.
Portland OR 97205 United States
5033065204
5033065240