Skip to main content

Interview session 5, 2000 September 29

 Item — Multiple Containers

Scope and Contents

Tape 8, Side 2, through Tape 9, Side 2. In the fifth and final interview session, conducted on September 29, 2000, Eckman continues to discuss serving as manager of conservation resources for the Northwest Power Planning Council, with a focus on the period between 1995 and the time of the interview. He talks about conducting a comprehensive review of the Northwest power systems and about developing the 1996 version of the conservation and electric power plan. He also speaks at length about the financial situation of the BPA, and about factors affecting its energy prices.

Dates

  • Other: 2000 September 29

Creator

Conditions Governing Access

Collection is open for research.

Extent

From the Collection: 0.1 Cubic Feet (9 audiocassettes (8 hr., 30 min., 32 sec.) + transcript (222 pages))

Language of Materials

From the Collection: English

Repository Details

Part of the Oregon Historical Society Research Library Repository

Contact:
1200 SW Park Ave.
Portland OR 97205 United States
5033065204
5033065240